Arizona Department of Transportation
Arizona Department of Transportation
Working Together We Can Make a Difference
Arizona @ Your Service

Keyword Search   Go
 
Cherry Creek Improvements

Cordes Junction Interchange

Interstate 17

State Route 69

State Route 87

State Route 89 and State Route 89A Corridors

State Route 169

State Route 260 Corridor

Sunset Point Rest Area Renovation

US 60 Phoenix-Wickenburg Highway

Wickenburg Bypass



Additional Planned Projects



Prescott District Projects Home Page
 az511  az511
Adopt a Highway Program

 Adopt
 a
Highway
Program



Planned Projects


I-17 - Black Canyon Hill South Bound

A pavement preservation job is being planned for South Bound I-17 from Milepost 245 to Milepost 249.5.


I-17 - New River - Cordes Junction Study

ADOT is studying this corridor for possible additional lanes and/or alternate routes.

Current Alternative Alignments

For additional information refer to the Project Web site.


I-17 - McGuireville Traffic Interchange

For the Week of November 10:

Project Description:

ADOT will begin an improvement project at the I-17 and McGuireville. The following are planned improvements:

  • Widening northbound between Mile Posts 292.93 and 293.62
  • Widening southbound between Mile Posts 292.93 and 293.62
  • Widen Dry Beaver Creek bridges
  • Replace bridge decks
  • Extend the existing entrance and exit ramps
  • Construct retaining walls
  • Mill and repave the roadway
  • Replace guardrails, signing, lighting, and pavement markers

I-17 McGuireville Traffic Interchange Improvements
The graphic above shows the planned improvements

Concrete Barriers in Place

Traffic will begin to see crews placing concrete barriers between the northbound on-ramp at McGuireville and just north of Dry Beaver Creek Bridge. Barriers provide crews a safe work zone on the shoulder of the roadway to begin work. Crews will begin to clear brush just off the northbound on ramp. Be aware that the acceleration ramp will be shortened due to the concrete barriers. Use extra caution when merging onto I-17.

Bridge Foundations Underway

Crews will begin to drill foundations near Beaver Creek to support the planned bridge widening. This work is not expected to affect or restrict traffic on I-17.
 

 

 

Contact Information

1.888.236.4374
or
Contact
Prescott District Updates


Sign up for Construction Updates!

First Name

Last Name

Email

Zip Code



 
Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation All Rights Reserved