Environmental Overview Outline
This outline will guide the practitioner in preparing environmental
overviews, which often precede the preparation of Environmental
Assessments.
Environmental
Overview Outline
Environmental Field Review Form
This form is to be used by consultants to document findings of
project field reviews, which occur at the beginning of the Project
Assessment/Scoping phase.
Environmental
Field Review Form
On-Call Consultants and EPG Meeting Summary - February 2007
This is an excellent and comprehensive summary of the meeting
with EPG and its on-call consultants on February 28, 2007.
On-Call
Consultants and EPG Meeting Summary
Project Data Sheet
This form is to be submitted by on-call consultants when they
do their preliminary environmental investigation on newly assigned
projects. This form is to be submitted with every cost estimate,
amendments, and various environmental reports and studies.
Project
Data Sheet
Project
Data Sheet Revision Chart
Task Order Worksheet
This form is to be used by on-call consultants when preparing
cost estimates for an environmental clearance on a new ADOT project.
Task
Order Worksheet
On-Call Orientation Training Presentations
These Powerpoint-style presentations were presented to EPG on-call
representations during an orientation training session conducted
in October 2006.
Introductory
Presentation
Biology
Presentation
Air
Quality Presentation
Noise
Presentation
Historic
Preservation Team Presentation
Section
4(f) Presentation
Hazmat
Presentation
Environmental
Justice Presentation
Local
Government Presentation
NEPA Process Flowchart
This comprehensive flowchart illustrates the various steps in
the environmental process from the beginning of a highway project
to the final environmental clearance. It includes hazmat, air/noise,
archaeology, and so much more! A must for all practitioners involved
in environmental work for ADOT.
NEPA
Process Flowchart
Notes and Reminders
This handy information sheet can be used for quick reference for
various administrative and planning activities when doing environmental
studies.
Notes
and Reminder Sheet
Geotechnical Clearance Process
EPG has produced a streamlined electronic documentation process
for geotechnical clearance. The links below provide guidance and
required documentation to process geotechnical clearance for ADOT
projects.
Geotechnical
Clearance Process
Geotechnical
Compliance Form
Geotechnical
Investigation Biological Clearance Form
Draft
Preliminary Initial Site Assessment (PISA) form
Monthly Project Status Report Guidance
This guidance is to help Environmental Planning Group on-call
consultants prepare Monthly Project Status Reports. Included are
notes in filling out the spreadsheet, an example Monthly Project
Status Report spreadsheet, and a blank Monthly Project Status
Report spreadsheet to fill out.
Notes
on filling out the Monthly Project Status Report
Example
Monthly Project Status Report
Blank
Monthly Project Status Report
ADOT District Engineers
This list includes the current ADOT District Engineers and contacts.
ADOT
District Engineers
ADOT Transportation Board Members
This list includes the current State Transportation Board members.
ADOT
Transportation Board Members Web Page
Documents are posted as they become available in PDF format, which
requires Adobe Reader to view.
|