skip navigation
Arizona Department of Transportation
 
  Home Page :: Site Index
 
Site Map

EPG's FTP Site



Planning

Material Sources

Air Quality

Noise

Hazardous Materials

Biology/Water Quality

Cultural Resources



Environmental Documents

Guidance

Videos

Public Notices

Links



Contact EPG



Environmental Planning Group Home Page
Arizona Travel Information Travel Info AZ511.gov
Adopt a Highway Program Adopt a Highway Program

 
US 93: SR 89 to Wickenburg Interim Bypass

Draft Environmental Assessment
The draft Environmental Assessment (DEA) documents the environmental impacts and mitigation measures for the proposed project on US 93 within the northern limits of the Town of Wickenburg, Arizona.

bullet  Cover and Title Page
bullet  Table of Contents
bullet  List of Figures, Tables and Appendices
bullet  Acronyms and Abbreviations
bullet  Mitigation Measures

bullet  Chapter I: Introduction
bullet  Chapter II: Existing Conditions
bullet  Chapter III: Purpose and Need
bullet  Chapter IV: Alternatives
bullet  Chapter V: Affected Environment and Environmental Impacts
bullet  Chapter VI: Public Involvement/Project Coordination
bullet  Chapter VII: Bibliography

bullet  Appendix A: Design Concept Plans for the Preferred Alternatives
bullet  Appendix B: New Right of Way Acquisition
bullet  Appendix C: Supplemental Water Quality Information
bullet  Appendix D: Supplemental Biological Resource Information
bullet  Appendix E: Supplemental Air Quality Information
bullet  Appendix F: Agency Correspondence
bullet  Appendix G: US Census Data

 

 

Documents are posted as they become available in PDF format, which requires Adobe Reader to view.


  

Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation. All Rights Reserved